Initially, the Jai Hind metro station was planned being elevated. Even so, the AAI objected the elevated stretch up to the airport could pose a danger to plane, Therefore the route was even more reworked along with the station was shifted underground, a hundred and fifty m in the Airport https://railwaygroupdjobs57787.blogsuperapp.com/32582731/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf